Every utility-scale wind turbine needs a rolled steel tower section fabricated in-country.
$BWEN welds them in Abilene and Manitowoc.
𝘛𝘩𝘢𝘵'𝘴 𝘵𝘩𝘦 𝘰𝘭𝘥 𝘴𝘵𝘰𝘳𝘺.
The Abilene tower plant is being sold to IES for up to $19.5M and winds down this quarter, leaving https://t.co/nr