This is insane:
$SPCX Terafab is reported as a vertically integrated complex with roughly 100 million square feet of manufacturing space, covering logic, memory, packaging, and testing
Micron’s ID1 fab in Boise has an approximately 1.2 million-square-foot footprint and about